The Bosch Group
Port of Miami Terminal G
New construction of a two-story cruise terminal in Port of Miami with an adjacent parking garage. Scope includes redesign of the existing road layout and circulation adjacent to Terminal G and Terminal F.
SIZE: 766,514 SF (Terminal & Garage)
CONSTRUCTION COST: $294,312,449.21
COMPLETION DATE: Ongoing